オフィシャルブログ

【Construction work site example】Construction work before moving in. Shinjuku clinic.

Hello everyone!We here are Office recovery and restoration Dot.Com. website.

Our company has an office at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto area, we are an interior decorative finishing construction work contractor professionally taking charge of all of《interior decorative finishing work》《recovery and restoration construction work》specialized in office construction work.

 

Today, an interior decorative construction work site which we are explaining is a before moving in construction work at internal medicine clinic.

 

Construction work of before moving in tenant.

We supported smooth moving in for a tenant customer with relieved construction work.

Everyone can work at his or her ease pleasantly. In order to make that charming space, we building construction work expert utilizes abundant experiences, and carry out highly specialized construction work operation.

Through diligent and frequent advanced meeting with a customer, we go on making drawing of the most suitable pattern, then are preparing more functional and efficient office environment.

 

The construction work contents are wall, floor, door, ceiling and so on, which are related to subordinating skeleton construction work.

Doing increasing work involving in big and small concept partition’s anti-disaster facility,  and air-conditioning facility’s changing・moving・increasing.

 

We requested electricity work to other specialized company.

 

The following picture is that of before moving in.

 

Various places such as electric wiring are in bare situation.

At this time, curing work operation has been already completed.

 

In the first place, we move in relative materials.

After that, we spread mat all over on the floor.

 

 

We go on assembling and mounting LGS (=light gauge steel) at the ceiling.

 

 

After finishing the work of ceiling, we set up the room wall with LGS conforming with floor mat.

 

 

We process gypsum board conforming with LGS, and do sticking work operation.

 

At the same time, we set up fixture frame at wall and ceiling bedding.

 

 

 

When partition wall work operation is close to be finished, we stick on gypsum board at the ceiling too.

 

 

After completing board work operation, we execute various things such as cloth construction work or so for finishing work operation.

 

 

 

 

After completing board work operation, we execute various things such as cloth construction work or so for finishing work operation.

Above all are the rough contents.

 

This time, our explanation is about clinic site.

As our company is dealing in office buildings, and various tenant items, we are waiting for your relative inquiry light heartedly.

 

 

On『office renewal』『tenant renovation decorative work』, as we are happy to answer for youe your moving in construction work, and various interior decorative construction work・recovery and restoration construction work.

Please be sure to give your relative inquiry to us light heartedly in the first place!

 

 

 

~~~~~~~~~~~~~~~~~〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜~~~~~〜〜〜〜〜〜〜〜〜〜

 

Instagram     Twitter     Facebook   

You can also give us your relative inquiry from above SNS.
Please be sure to see above SNS once at least by all means.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

 

★If you look for interior finishing work in Ikebukuro, ask for Office restoration Dot Com.

★If you also look for restoration work in Tokyo, please ask Office restoration Dot Com.★

Address:〒171-0014  
4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226