Today, we are explaining『Floor placement work method』as a construction method.

Floor placement work method is, directly placing building base on the ground and assembling and working, a traditional work method which has been used from long time ago.

 

 

Recently, because of its simple and effective character, it is attracting significant notices again.

 

 

The merits of floor placement work method

 

The cost efficiency is high:

It can greatly reduce the cost related to base work.
As it is not necessary to excavate the base, it only requires to flatten the ground, it can save the cost of construction.

 

Construction period is short
As excavation work is not necessary, the base work time can be saved.
If you would like to shorten building construction schedule, it is particularly suitable.

 

Earthquake resisting property is high:
As there is no gap between the base and the building, shakings such
as earthquake and so on directly spread to the building easily.

Therefore, earthquake resisting property is enhanced.

 

Environmental friendly:
As the excavation work is little, the influence to the base and surrounding environment is going to be small.

In addition, occurring of waste material is also diminished.

 

 

The work process of floor placement construction method

 

 

1.Investigating the ground

We investigate the ground at the building site.
We grasp the ground strength, depression and so on, and work out a suitable measurement.

 

2.Flattening the ground

If the ground is not flat, we do flattening work operation.
Through doing this, we secure the base stability.

 

3.Installing base

We install concrete block, steel and so on the ground, and form the base.
It plays a role of scattering the building weight.

 

4.Building construction

After completing the base, we construct the building.
We install the wall and pillar, then the building construction is finished.

 

 

Summary

As for floor placement work method, the cost efficiency is high, and the construction period is short.
Therefore, it is also known as a construction work method in the spotlight again recently.

 

It also excels in earthquake resisting property, so it is known as a work method which is well   environmentally considered too.

 

However, depending on the ground state, as there are sometimes unsuitable grounds too, the ground investigation in advance is indispensable.

 

If you are requesting to construct a building, how about considering floor placement work method?

 

We so far explained the merits of floor placement work and its construction method.

 

Finally,

On your interior decorative work such as office original state recovery and restoration work.
please give us your inquiry light heartedly!

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226