オフィシャルブログ

Required skill at the work site! Importance of so-called ink marking work and its role

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work for you.

 

This time, we are taking up「so-called ink marking work」which is one of the indispensable skills at the construction site.

On construction work, interior decorative work, and civil engineering work, so-called ink marking work is an important work for setting reference point, and showing the precise position and angle.

Accurate so-called ink marking work is, a must for the building stability and for securing beauty.

 

 

So-called ink marking work is just the line drawn in the following picture.

 

 

 

 

 

 

1.Basic knowledge of so-called ink marking line work

 

What is so-called ink marking work? On its purpose and role.

So-called ink marking work at the construction site and civil engineering work is, an important work for setting reference point, and showing precise position and angle.

Based on the design drawing of building and structure, we do marking at the site ground and the wall surface, then secure work progress and building stability.

By precisely showing the pillar, wall, beam, and other location, so-called ink marking work plays a role of stabilizing the building structure.

So-called ink marking work is an important factor for securing the building beauty and symmetry too.

 

 

History of so-called ink marking work

So-called ink marking work history and its change of importance:  So-called ink marking work is a skill which has been done from long ago at the construction site.
At the buildings in ancient Egypt and ancient Rome too, so-called ink marking work skill had been used.

At that time, thread and rope were used for setting reference point. But, in the present era, high tech tools such as survey instrument, laser levelling and so on have become to be used.

 

The importance of so-called ink marking work changed too.
More precise measurement has been required.
So-called ink marking work is also contributing to building stability and enhancement of earthquake resisting property.

 

 

Basic terms related to so-called ink marking work and its tools

As to so-called ink marking work, a few basic terms and its tools are concerned.

 

Firstly, reference point is a point to show a position and angle decided in the design drawing of the building and the structure.
In order to set reference point, so-called ink marking work use thread and so-called ink marking work use peg, survey instrument, and so on are used.

 

So-called ink marking work use thread is used to show reference position, while so-called ink marking use peg is used for fixing thread.

As to survey instrument, there are level device, optical level, laser level and so on, and they are utilized for more precise measuring result.

 

 

 

 

2.Procedure and skill of so-called ink marking work

Ink pot

Ink pot

 

 

Setting reference point and marking method

As to so-called ink marking work, firstly, based on the building and the structure design drawing, we set reference points.

Reference points are set up at the building edge, pillar, wall and/or other important parts.

By using survey instrument, we decide on the position and height of reference points, and draw a so-called ink marking thread to match them.

So-called ink marking thread is used to show the position of reference point, and it is utilized for marking each part of the building.

For marking, so-called ink marking use peg, tape and so on are used, then we clearly show the building structure and the measurement.

 

 

Method of drawing so-called ink marking work and securing accurate angle

So-called ink marking lines are drawn for showing the building and the structural factor.

By drawing so-called ink marking use thread along reference point, and applying ink, we make ink lines.

Ink lines are for precisely showing the position of building wall, pillar and so on.
It plays an important role for checking work progress and building structure.

For drawing the way of ink lines, it is also important to secure accurate angle.

In order to measure the angle precisely, it is typical to use survey instrument and/or level device.

 

 

 

Presision of so-called ink marking work and coping with environmental factor

So-called ink marking work precision is very important for securing building stability and exact measurement.

However, chances are that environmental factor may influence so-called ink marking work precision too.

Wind, vibration, temperature change and so on may possibly influence so-called ink marking work.

Therefore, before doing so-called ink marking work, it is important to consider environmental factor and take necessary measures.

In addition, by doing regular measurement and adjustment, it is also necessary to maintain so-called ink marking work precision.

 

 

 

 

 

Summary

 

 

So-called ink marking work is an indispensable skill at the construction site and civil engineering work.

By setting exact reference point and drawing ink lines, it plays a role of securing building stability and beauty.

 

There are basic terns, tools, and procedure for so-called ink marking work. By utilizing them suitably, it is possible to do so-called ink marking work with high precision.

Coping with environmental factor and regular adjustment are important factors for so-called ink marking work too.

For the successful work at the construction site, so-called ink marking work skill and knowledge are indispensable.

Please try to challenge so-called ink marking work at the construction site with reference to these pieces of information by all means!

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226