Construction site example | New tenant work (Interior decorative work) at a multi-purpose building in Ageo city, Saitama prefecture

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

We have been setting up our company office at Ikebukuro, Toshima ward, Tokyo, and we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work in all over Kanto district for you.

 

This time, we are introducing and explaining a construction situation in Saitama prefecture. It is a new interior decorative work of a certain tenant.

 

The interior decorative groundwork construction in the tent property is a very important process for finishing the space of shop, store, office and so on wonderfully.
We can realize a beautiful finishing result and long-term durability by doing the groundwork construction well.

Firstly, we are explaining the purpose of groundwork construction.
Groundwork construction is a work operation of neatening the surface of wall, floor, ceiling and so on evenly.
The main purposes of groundwork construction are as follows:

 

  • ●Adjusting, repair, mending of groundwork:
    By neatening the groundwork surface evenly, when doing finishing work of wall paper・so-called decorative cloth and so on, unevenness and 凹凸
    will be difficult to happen.
    By doing these, a beautiful finishing result can be realized.
  • ●Going up durability
    We strengthen itppropriately in the groundwork construction.
    By doing this, the strength of the interior decorative material and the durability will go up, so deterioration and damage by using long time will be reduced.
  • ●Stability:
    Groundwork work construction is an important process of securing wall and ceiling stability.
    By doing an appropriate groundwork construction, gypsum board and so on are fixed well, so the stability will be secured.

 

 

 

  • ●Installing steel frame:
     The first step of groundwork construction is installing runner.
    By cutting the runner to match the wall and ceiling suitable place, then we fix it at the accurate place.
    By using a laser measuring instrument or the like, while confirming horizontal and vertical level, we install the runner firmly.

 

 

We install stud. What is erected vertically against runner is stud.

 

  • ●Installing strengthening material:
    If it is required, we install a strengthening material.
    We sometimes install it at the open door part and so on, so it will enhance the structural strength and stability.
    By placing the strengthening material at the appropriate position, we will fix it with screw and so on.

 

  • ●Installing the board:
    The final process of light steel groundwork is installing the board.
    As a general board, there is gypsum board.
    By cutting the board to the suitable size, we install it to the light steel groundwork with screw.

 

  • ●Adjusting, repair, mending of groundwork::
    After the board work, we confirm the groundwork flatness.
    If it is necessary, we will adjust, repair, and/or mend it.
    In order to fill 凹凸 and cracks, we use a suitable repair and mending material.
    By using a repair and mending material, we secure the flatness of work surface, and enhance the finished quality.

 

 

  • ●Transferring to finishing process:
    After completing light steel groundwork construction, we proceed to the next process.
    In the finishing process, we do interior decorative finishing, such as painting, sticking wall paper, flooring, and so on.
    As light steel groundwork excels in stability and durability, the construction of finishing material will proceed smoothly, so it is possible to realize a beautiful interior decorative space.

 

 

 

 

The above is the basic flow of light steel groundwork construction procedure.
Light steel groundwork is a suitable material for tenant interior decoration which requires durability and stability.
For its construction, as the specialized knowledge and experience are necessary, we recommend you to request a well experienced construction contractor.

 

Please understand that we will execute construction in Japan only.

 

 


 

If you are considering to request us office building・tenant(shop or store)
original state recovery and restoration work, moving in work, relocation,
removal, renovation work, and so on,
please contact our company light heartedly by all means!

 

Instagram      X     Facebook  

You can also give us your relative inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, to supply
「reasonable construction work as much as possible,
with high quality, better work service」to our customers.

 


 

If you look for interior decorative work・
Returning to original state and restoration work in Ikebukuro,
Toshima ward, please visit Office restoration Dot.Com.

 

〒171-0014

4th floor, Musashiya No.3 Building, 62-10, 2-chome,
Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

施工事例|埼玉県上尾市 雑居ビル 新規テナント工事(内装工事)

What is safety countermeasure?| Introducing and explaining points to be noted when executing work safely Simplified version

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work in all over Kanto district for you.

Please talk with us anything on the interior decorative work.

 

What we are introducing and explaining today is,

Safety countermeasure when executing work

 

In order to proceed work safely, various factors are important.

The points of safety countermeasure of its elementary contents compiled are as follows:

 

安全第一に

安全第一に

 

《Safety countermeasures

 

Making a plan of safety and sanitation management

In the construction site, it is important to make a plan of safety and sanitation management in advance, and to execute it thoroughly.

When planning it, let’s include countermeasures for emergency situation and confirming necessary safety equipment.

 

・Checking out of instrument regularly

It is indispensable to check out the equipment and tools for using the construction regularly.

By using them in normal situation, it is possible to protect from an accident and a trouble during the work operation before happening.

 

・Safety countermeasure when operating high-place work

When operating at the high-place, it is particularly important to take safety countermeasure.

By wearing appropriate safety belt, installing handrail and so on, let’s do not neglect countermeasures in advance.

 

・Confirming construction method

Upon proceeding the construction, let’s confirm the using construction method and the materials.

Selecting the right construction method will lead to protect from ocuring an accident.

 

・Executing danger prediction training

Let’s carry out training, so that all the staff work workers can predict possible danger and can appropriately cope with it.

Quick decision will defend from an accident before happening.

 

・Countermeasure corresponding to temperature

If the temperature condition changes, it is necessary to adopt a measure to correspond to it.

Let’s try best to take suitable measures against rain and wind.

 

・Thoroughness of 5S

By doing five-point thoroughness of 5S, namely sorting・setting-in-order・shining・standardizing・sustaining the discipline, we neaten the environment of work operation.

By doing these, we can expect to go up efficiency and defending from an accident.

 

・Sharing unsafe incidents

By sharing unsafe incidents among staff workers, and sharing the information, we will keep the safe environment.

 

・Health condition management of staff workers

By grasping health situation of staff workers, and securing suitable rest and nutrition, we will defend an accident suffering from ill health.

 

・Education of staff workers

Let’s carry out basic education on safety to all of the staff workers.

By sharing right knowledge, it is possible to minimize outbreak of the danger.

 

・Strengthening communication

Smooth communication in the work operation site is inevitable for preventing an accident in advance.

Let’s care for sharing the information and cooperation.

 

・Countermeasure in the case of the worker’s accident outbreaking

If a staff worker’s accident occurs, clarifying the process for taking quick and suitable countermeasure and all of the staff workers grasp it in advance are important.

 

By observing all of these above points, it is possible to secure the safety in the construction site, and protect staff workers’ health.

Let’s consider to take enough safety countermeasure in order to proceed the construction smoothly.

 

Summary

For construction site safety, it is inevitable to take planned countermeasure and cooperation of all of the staff workers.

Let’s always pay attention to safety and have a posture to be able to cope with a predictable risk.

Maintaining safe work operation environment not only directly links to success of the project, but also links to the health and happiness of all the persons connected.

Let’s share the thought of safety first, and always try best to prevent from danger before happening every day.

Safe construction will lead to reliance and high quality, and will make a part of establishing better work environment.

 

Please understand that we will execute construction in Japan only.

 

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

If you are considering to request us office building
tenant(shop or store)original state recovery and restoration work, moving in work, relocation, removal, reform work,
and so on, please contact our company light heartedly by all means!

 

Instagram      X     Facebook  

You can also give us your relative inquiry from SNS social media. Please be sure to see it together.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves. Our aim is, to supply「reasonable construction work as much as possible, with high quality, better work service」to our customers.

◆If you look for interior decorative work・Returning to original state and restoration work in Ikebukuro,Toshima ward, please visit Office restoration Dot.Com.◆

 

〒171-0014

4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

安全対策とは?|安全に工事をする際の注意点のご紹介 簡略編

What is gypsum board? Explaining【naming・usages・kinds】in detail.

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and we are  an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work in all over Kanto district for you.

 

On any of interior decorative work, please take counsel with us!

 

We are introducing and explaining gypsum board in the blog this time.

 

Nowadays, as one of the indispensable materials for architectural interior decorative work, we thought we would like to research gypsum board more in detail, so we coordinated the following article.

 

 

画像引用:吉野石膏様より

Picture quoted from Yoshino Gypsum Co. Ltd.

 

 

Picture quoted from Yoshino Gypsum Co. Ltd.

 

What is gypsum board?

 

Gypsum board is a kind of construction material used for wall and ceiling finishing, and reinforcement in the construction and interior decorative work.

 

About the naming of gypsum board:

Generally, it is also called as「dry wall」or「gypu board」.

Gypsum board has different common names in countries and areas.

As there is a possibility of difference in the areas, when confirming a name used in particular area, kindly try to check its own naming.

 

●Dry wall

In many countries such as USA, Canada and others, it is called as「dry wall」.

This name derives from dry type construction process of gypsum board.

 

●Gypsum board

「Gypsum board」is related to the main component of gypsum.

This name is general in the world.

 

●Plaster board

It is called 「plaster board」in England and some English speaking countries.

This name derives from the fact that plaster was used for wall finishing before.

 

Wall board

It is called「wall board」in some areas.

This name is related to be used for wall finishing material.

 

●Board rock

It is sometimes called「board rock」in Japan and some countries.

This name is a common general naming for pointing gypsum board.

 

●Construction plaster board

It is also called「construction plaster board」in some areas.

It is a name often used in the construction industry.

 

About materials of gypsum board:

 

Firstly, the main component of gypsum board is, a mineral raw material (calcium sulfate dehydrate) called gypsum.

This gypsum is the main material of gypsum board. By hardening it, it constitutes solid board shaped structure.

Its structure consists of two paper sheets sandwiched gypsum center layer usually.

Generally, its thicknesses are various sizes from 1/4 inch to 5/8 inch.

Main general size is 4×8 feet.

Gypsum board is used for wall and ceiling interior decorative material. In order to finish the room space inside, it plays a role of base material for painting and sticking on tyles, wall papers and so on.

In addition, it is also used for partition wall, sound insulating wall, fire resisting wall and other structure construction.

 

Characteristic:

 

  • Fire breakout resistance: some gypsum board includes additive for enhancing fire breakout resistance. It is particularly used at the places for requiring fire resistant property.

 

  • Sound insulating property: A particular kind of gypsum board is designed for enhancing acoustic effect and controlling noise.

 

  • Waterproof property: Some gypsum board has waterproof property for using at high humidity places, so it is suitable for using at the bath, kitchen wall.

 

Gypsum board is relatively light and easy to handle, so it is being generally used in the interior decorative work very much.

 

It is possible to use various kinds of gypsum board in the market, so it is important to select appropriate kind according to the content of interior decorative work.

 

 

Various usages of gypsum board: From interior decorative finishing to screening

 

1.Interior decorative finishing of the wall and ceiling

Gypsum board is the most used for the interior decorative finishing of wall and ceiling generally.

It is used to combine with joint compound, and makes smooth surface.

By doing this, it is ready to fit wall paper, other decorative material and/or to paint.

 

2.Screening

Gypsum board is used for hiding electricity wiring, piping, heat insulating material and so on in the wall.

It is possible to place wiring and piping without opening the wall, so it provides functional screening, while keeping beautiful sight.

 

3.Fire resisting property

Some gypsum board has fire resisting property, so it plays a role of delaying fire expansion.

This is important for commercial facility, multi-family residence and so on.

Using example: Fire resisting gypsum board is used at the office building partition wall, so it is securing safety to prepare for fire breakout in case.

 

4.Sound insulating property

Gypsum board excels in sound insulating property. By using it at the wall or ceiling in interior decoration, sound transmission is controlled. This characteristic is suitable for using it at the apartment and office building.

Actual usage: On the wall of art studio, a kind of gypsum board of high sound insulating property is installed, so noisy sound outside is controlled as much as possible, and is providing creative environment.

 

5.Light weight property and easy handling

Gypsum board is light, so handling it is easy. For this reason, quick progress of interior decorative work process becomes possible.

 

Example: In DIY(do-it-yourself), installing gypsum board and handling are easy, so new wall surface can be made quickly.

 

Summary.

 

Because of its various usage and excellent characteristics, gypsum board is one of the indispensable construction materials in the modern interior decorative industry.

From interior decorative finishing up to screening, fire resisting property, and sound insulating property, it is bringing into high effectiveness by various usages.

 

When planning interior decorative work, considering gypsum board utilizing method is an important process.

 

Chances are that the ways of using gypsum board are different according to work kinds and requirements.

In interior decorative work of big scale decorative renovation work or that with special requirement, it is important to receive an advice from its specialist.

 

Please also refer to the blog here.

On gypsum board and rock wool sound absorbing board

What is sound absorbing board? Difference from sound insulating board.

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

If you are considering office building・tenant(shop or store)original state recovery and restoration work, moving in work, relocation, removal, reform work, and so on, please contact our company light heartedly by all means!

 

Instagram     Twitter     Facebook   

You can also give us your relative inquiry from SNS social media. Please be sure to see it together.

 

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

 

 

 

A construction site example|At an apparel tenant work Renewal work(Interior decorative work) in Kisarazu city, Chiba prefecture

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and we are  an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work in all over Kanto district for you.

 

On any of interior decorative work in the office, please take counsel with us!

 

This time, we are explaining【Renewal work】at a construction site of apparel tenant(shop) in an outlet.

 

 

What is renewal?

 

Renewal means, making an old thing renew, or re-make.

When renewing shop or store, building, this word is used with re-decoration and refurnished opening.

When doing renewal, chances are that sometimes a large scale work is executed, renewing its function and/or design, or changing its layout too.

 

 

Then, when is the timing of doing renewal work?

If you continue to manage running a shop or store for a long time, due to the shop or store deterioration, its maintenance and cleanliness renewal are not avoidable to do.

Re-decoration・extension work are good chances for renewing its inside.

Shop or store re-decoration(re-mending) and extension work are often done out of necessity. But, by doing further invention will lead you for gathering more customers. So, please consider it by all means.

 

 

We are introducing and explaining a construction site example.

 

【Construction details】

This time, due to the renewal opening, we executed its interior decorative finishing work.

As it is an apparel shop, we changed the layout and others.

We made a fitting room, the place to put inventory, and a new partition wall for a resting room.

The work contents are, caring the floor, doing LGS (=light gauge steel) work, doing board work, doing putty treatment, and sticking so-called decorative cloth finishing.

 

It required about two months work period.

 

We are introducing some of the construction site pictures as follows:

 

 

 

The above are some of the construction site pictures.

 

If you are considering shop or store renewal work (re-decoration work), please take counsel with us light heartedly by all means!

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

If you are considering office building・tenant(shop or store)original state recovery and restoration work, moving in work, relocation, removal, reform work, and so on, please contact our company light heartedly by all means!

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

What is OA (=office automation) raised floor? What kind of merits・demerits are there, and how is it constructed?

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

We are taking charge of「Interior decorative finishing work」「Original state recovery and restoration work」mainly in Ikebukuro at the midpoint, and in all over Kanto district for you.

 

This time, we are explaining a theme of,

 

What is OA floor? What kind of merits・demerits are there, and how is it constructed?

 

If you are an office worker, you may sometimes hear of the theme, however, on OA floor, if you actually asked about it, it may be hard to precisely answer that at once, so we are roughly explaining it.

 

What is OA floor?

 

 

The picture quoted from Japan Free) access  floor Association website. The official website is here.

 

In the office, OA floor is, mainly pointed to be, so-called double flooring, which is, in order to make cable wiring such as LAN, power source and others smooth, for providing space passing  wiring on the existing floor and executing work on it.

As a general name, it is also called「free access floor」and so on.

It was only used for some limited placed at server room, clean room and so on before. However, in the modern days when IT introduction advanced, it is also used in almost all the general offices.

 

Merts of OA floor

 

Main merits of OA floor are as follows:

 

  • ●As its wiring lines are not bare on the floor, it is neat visually, so possible danger of stumbling is reduced, and cleaning is easy.
  • ●When moving household goods, furniture and so on, it plays a role of protection to prevent from catching on the wiring.
  • ●As the floor mat is easy to be taken off, so changing wiring lines is easy.
  • ●As only if the length matches, it can be wired from anywhere, so  furniture・household goods layout is free to do.

 

There are above features.

 

Demerits of OA floor

 

On the contrary, demerit points can be taken up such as:

 

  • ●In the case of executing OA floor which was executed other floor work not OA floor before, as the floor height goes up, oppressive feeling is given.
  • ●In accordance with it, as slope should be installed, dead space around the entrance space is made, you may possibly feel inconvenience.
  • ●As the materials and heights are various, unless executing to match as required, there is possibly a lack of strength.

 

As the biggest merit, the freedom of wiring・layout goes up.

 

Usually, wiring should be protected to pass on the floor with mold, or it should be considered not to interfere office staffs walking. However, by wiring under the floor and putting out the line by the desk, it decreases the possibility of stumbling, and visual neat feeling changes very much.

No possibility of stepping on the wiring or hurting it with furniture also means to protect it.

From the beginning, the reason of it made for server room and clean room is exactly for this.

 

If it is a light weight type, as it is also easy to remove it, it can flexibly cope with layout change too.

In addition, for just in case, non-combustible material is often used for it.

 

The demerit point which is the most often taken up is, in the case of installing OA floor which was executed other floor work before, the floor goes up, there may be oppressive feeling. Therefore, we usually have to install a slope.

 

We install OA floor on the original floor, and in proportion to the heightened, usually in order to move out big household goods and stocked goods, equipment easily, we install a slope.

 

For this, in the case of having installed high OA floor particularly, the slope also becomes long, and extra space is going to be necessary.

 

In the modern times, as most of offices are constructed in anticipation of executing OA floor as the standard, so this problem only occurs when executing work from afterwards, not in order.

 

On lacking of strength which we took up above demerits, as there are various kinds of OA floor too. For example, there are「pillar supporting type」which is by using jack, freely pulling up to a certain degree, which can be freely wiring below, and「placing and spreading type」which is oppositely in block state and groove is on up and down.

As to the materials, there are various kinds too. There are inexpensive resin made, strong steel made, and heavy concrete made, and so on, which are manufactured by various makers and are being sold.

 

At heavy places such as server room and so on, we must adopt an OA floor to be able to endure heavy load.

Recently, resin made type with enough heavy durability products have been increasing too.

If you request the relative construction, it may be good to take counsel of requiring how heavy load bearing is needed to endure the OA floor.

 

OA floor construction method

 

1.We move goods at which area OA floor will be placed, we expose the floor ground.

2.After cleaning, we make the floor neat not to have凹凸. We get rid of protrusion and the like.

3.Placing cushion sheet, we go on lining up OA floor on it. We go on cutting the connecting parts such as edge part at the site.

4.We install slope・frame.(If it is a property of originally made for OA floor use, this process is not necessary. )

5.We go on spreading in finishing materials such as tile carpet, vinyl chloride tile and so on, on OA floor.

6.Others, after inspection, we pass the property to the tenant renter.

 

A special adhesive which can be sticked and stripped easily is used for tile carpet for OA floor finishing.

In the server room, antistatic function added tile such as SEIDEN tile C or the like is used.

 

Extra

 

We are brieflyintroducing tenant examples which our company executed construction before as follows.

施工写真 OAフロア 露出時の様子

The picture of curved surface wall construction. Seeing the lower part, concrete type OA floor is visible.

 

 

施工写真 OAフロア タイルカーペット一部施工の様子

In this picture, tile carpet is partly constructed at the same place.

 

 

 

施工写真 OAフロア その3

At the same site, different place. As it is concrete type OA floor, it is not possible to change the layout easily. However, there is satisfactory durability for wiring protection.

 

 

Summary, and finally

 

 

We so far explained What is OA floor? What kind of merits・demerits there are, and how it is constructed?

 

Nowadays, in the general office, the case of wiring been stretched on the floor has become little. However, because of office relocation or so, at the new location, if it is not OA floor, it is necessary to request the relative new construction to a contractor.

Including OA floor, we are happy to receive your full set order of interior decorative work.

On your requests such as「I want to change the present office layout」,「as I am not satisfied with the present〇 〇, can you solve the problem?」, and so on, please take counsel and give us your quotation request light heartedly.

 

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=

Let alone office・shop or store ceiling, wall repair and recovery, painting work, concerning new opening, renewal, and so on, please take counsel with Office recovery and restoration Dot.Com. light heartedly by all means.

 

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

What is original state recovery and restoration work? Important points of property renting

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work for you.

 

Please take counsel on anything on office interior decorative work.

 

To readers of this article: When you lease a rental property, have you ever heard of the phrase「Original state recovery and restoration work」?

This phrase is pointed to be an important operation work executed before you leave the rental property.

 

This time, we are explaining original state recovery and restoration work in detail.

 

 

 

What is original state recovery and restoration work?

 

Original state recovery and restoration work is, pointed to be a remedial・repair and recovery work done, when leasing a rental housing residence.

In the case of renting a property, when moving in, the environment to live in is ready. However, before leaving it, it is required to be returned to the situation when moved in.

 

This is called「original state recovery and restoration」, and the work for that is called「original state recovery and restoration work」。

 

 

Why is original state recovery and restoration work necessary to do?

 

Because of the following reasons, original state recovery and restoration work is necessary to do:

 

1.Executing the contract condition: In the rental property contract, before leaving it, according to the settled contract condition, it should be returned to the original situation.

By doing original state recovery and restoration work, it is possible to execute the contract condition and to prevent to occur troubles.

 

 

2.For the following renter: If the renter before remains hurting and/or stains, as the result of original state recovery and restoration, the next renter may have to stay in uncomfortable environment.

By doing original state recovery and restoration work, it is possible to supply comfortable living environment to the next renter.

 

 

3.Refunding the deposit: In many cases, when renting a property, deposit is necessary to pay.

By doing original state recovery and restoration work and returning the property to clean situation, the deposit can be refunded smoothly.

 

 

 

 

 

 

Main contents of original state recovery and restoration work

 

Contents of Original state recovery and restoration work are different according to the rental property situations and contract contents.

However, as general contents, there are the following details:

 

●Changing wall paper and floor material

●Repairing and mending hurts and holes

●Cleaning, repairing and recovering water used areas

●Repairing and changing lighting fittings

●Repairing, painting doors and windows

 

 

 

Summary

 

Original state recovery and restoration work is, an indispensable process when renting a property.

In order to observe the contract condition, to provide comfortable environment to the next renter, and to receive the refund smoothly too, it is important to execute original state recovery and restoration work sufficiently.

 

By returning the property to the just moved-in state, it is possible to maintain recycling of the lease property, and to realize smooth moving-in and leaving procedure.

 

Please also refer to the below-mentioned blog by all means.

原状回復工事(オフィス・店舗の移転)を内装工事会社に依頼するメリットとは?

What is the merit of requesting original state recovery and restoration work(office・shop or store relocation) to an interior decorative work company?

 

 

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

 

Finally,

 

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

Required skill at the work site! Importance of so-called ink marking work and its role

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work for you.

 

This time, we are taking up「so-called ink marking work」which is one of the indispensable skills at the construction site.

On construction work, interior decorative work, and civil engineering work, so-called ink marking work is an important work for setting reference point, and showing the precise position and angle.

Accurate so-called ink marking work is, a must for the building stability and for securing beauty.

 

 

So-called ink marking work is just the line drawn in the following picture.

 

 

 

 

 

 

1.Basic knowledge of so-called ink marking line work

 

What is so-called ink marking work? On its purpose and role.

So-called ink marking work at the construction site and civil engineering work is, an important work for setting reference point, and showing precise position and angle.

Based on the design drawing of building and structure, we do marking at the site ground and the wall surface, then secure work progress and building stability.

By precisely showing the pillar, wall, beam, and other location, so-called ink marking work plays a role of stabilizing the building structure.

So-called ink marking work is an important factor for securing the building beauty and symmetry too.

 

 

History of so-called ink marking work

So-called ink marking work history and its change of importance:  So-called ink marking work is a skill which has been done from long ago at the construction site.
At the buildings in ancient Egypt and ancient Rome too, so-called ink marking work skill had been used.

At that time, thread and rope were used for setting reference point. But, in the present era, high tech tools such as survey instrument, laser levelling and so on have become to be used.

 

The importance of so-called ink marking work changed too.
More precise measurement has been required.
So-called ink marking work is also contributing to building stability and enhancement of earthquake resisting property.

 

 

Basic terms related to so-called ink marking work and its tools

As to so-called ink marking work, a few basic terms and its tools are concerned.

 

Firstly, reference point is a point to show a position and angle decided in the design drawing of the building and the structure.
In order to set reference point, so-called ink marking work use thread and so-called ink marking work use peg, survey instrument, and so on are used.

 

So-called ink marking work use thread is used to show reference position, while so-called ink marking use peg is used for fixing thread.

As to survey instrument, there are level device, optical level, laser level and so on, and they are utilized for more precise measuring result.

 

 

 

 

2.Procedure and skill of so-called ink marking work

Ink pot

Ink pot

 

 

Setting reference point and marking method

As to so-called ink marking work, firstly, based on the building and the structure design drawing, we set reference points.

Reference points are set up at the building edge, pillar, wall and/or other important parts.

By using survey instrument, we decide on the position and height of reference points, and draw a so-called ink marking thread to match them.

So-called ink marking thread is used to show the position of reference point, and it is utilized for marking each part of the building.

For marking, so-called ink marking use peg, tape and so on are used, then we clearly show the building structure and the measurement.

 

 

Method of drawing so-called ink marking work and securing accurate angle

So-called ink marking lines are drawn for showing the building and the structural factor.

By drawing so-called ink marking use thread along reference point, and applying ink, we make ink lines.

Ink lines are for precisely showing the position of building wall, pillar and so on.
It plays an important role for checking work progress and building structure.

For drawing the way of ink lines, it is also important to secure accurate angle.

In order to measure the angle precisely, it is typical to use survey instrument and/or level device.

 

 

 

Presision of so-called ink marking work and coping with environmental factor

So-called ink marking work precision is very important for securing building stability and exact measurement.

However, chances are that environmental factor may influence so-called ink marking work precision too.

Wind, vibration, temperature change and so on may possibly influence so-called ink marking work.

Therefore, before doing so-called ink marking work, it is important to consider environmental factor and take necessary measures.

In addition, by doing regular measurement and adjustment, it is also necessary to maintain so-called ink marking work precision.

 

 

 

 

 

Summary

 

 

So-called ink marking work is an indispensable skill at the construction site and civil engineering work.

By setting exact reference point and drawing ink lines, it plays a role of securing building stability and beauty.

 

There are basic terns, tools, and procedure for so-called ink marking work. By utilizing them suitably, it is possible to do so-called ink marking work with high precision.

Coping with environmental factor and regular adjustment are important factors for so-called ink marking work too.

For the successful work at the construction site, so-called ink marking work skill and knowledge are indispensable.

Please try to challenge so-called ink marking work at the construction site with reference to these pieces of information by all means!

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

On OA (=office automation) floor|About office OA floor and construction method

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work for you.

 

On office interior decorative work, please take counsel with us anything.

 

 

 

Today, we are explaining,

「On OA floor」

which becomes very important area at the office.

 

Firstly, OA floor is, the area which possesses most of the floor space, which becomes the center place of office work.

OA is an abbreviation of office automation, which is pointed to be an office work using electronic device and computer.

At OA floor, it is playing an important role of corporate output efficiency, promotion of communication and so on.

 

OAフロア|ナカ工業様より引用

OAフロア|ナカ工業様より引用 
OA floor| quoted from Naka Corporation, Japan

 

 

 

 

 

There are various kinds of OA floor, and it is used for its purpose.

The main kinds are as follows:

 

Vinyl tile

Carpet tile

Rubber floor

Linoleum

Engineered stone floor

 

Each kind of OA floor has its own features and advantages. Vinyl tile has abundant color variation, and designability is high. Carpet tile has high heat insulating and sound insulating properties. Rubber floor has high durability. Linoleum has antibacterial and flame resisting properties, and so on. It is possible to choose from them to fit in with its usage and purpose.

 

 

 

画像引用:共同カイテック株式会社様より 

画像引用:共同カイテック株式会社様より 
The picture quoted from Kyodo KY-tec corporation

 

 

 

 

 

 

【OA floor work procedures】

There are the following procedures for OA floor work:

Base work preparation: Checking the floor surface state, we treat the base to secure the  flatness.

Underlay execution: Underlay is an import layer for enhancing cushioning and water proof properties. It secures floor stability by placing suitable underlay.

OA floor laying: We neatly lay the selected OA floor. We apply adhesive on the back side of the floor material, and place the floor material on the underlay.

Finishing work operation: We use sealant for filling the gap of floor materials, and finish by cleaning the floor surface.

 

【Advantages of OA floor】

There are quite a few advantages of OA floor. It has durability, and keeps beautiful state for a long time. It also has high abrasive resisting property. As there is little hurting damage by daily use and moving, maintenance is easy.

In addition, as OA floor excels in sound insulating property, it is possible to reduce unwanted sound.

It also excels in heat insulating and water proofing properties. By enhancing air-conditioning efficiency, it realizes to enhance energy efficiency and comfortable room interior environment. As it is stain and water resistant, it is easy to keep clean situation, so, it provides hygienic environment.

 

Furthermore, OA floor also excels in designability.

It is possible to choose one from various color variation and pattern.

It harmonizes the office and the interior design of commercial facility, so, it arranges a charming space.

 

OA floor is a choice of the environmental minded too.

A lot of OA floor is made from environment friendly materials, so, it is possible to recycle or use them again.

The materials which do not contain low VOD (volatile organic compound) are used for some of OA floor, which enhances quality of room interior air.

 

 

 

【Summary】

 

OA floor is a floor material which has a lot of advantages such as comfortability, durability, beauty, ecology considered, and so on. It is the most suitable material for using at the office and commercial facility, and it provides a comfortable work operation environment.

 

Our company’s experienced specially skilled staffs are executing the highest quality OA floor work.

We do our proposal and execute construction to match our customers’ needs, and hand to you a highly satisfactory work result.

 

As for your counsel with us or quotation request on OA floor work, please give us your inquiry from our company website, or directly contact to call us.

In order to answer for our customer’s requirement, we will provide the best service to you.

 

Through OA floor work, we are whole heartedly looking forward to be able to help you make comfortable and charming space.

 

Please also refer to the below-mentioned blog by all means.

 

OAフロアとは? どのようなメリット・デメリットがあり、どのように施工されるのか?

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

What is floor placement work method? On its merit and construction method

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing construction・Original state recovery and restoration work for you.

 

Today, we are explaining『Floor placement work method』as a construction method.

Floor placement work method is, directly placing building base on the ground and assembling and working, a traditional work method which has been used from long time ago.

 

 

Recently, because of its simple and effective character, it is attracting significant notices again.

 

 

The merits of floor placement work method

 

The cost efficiency is high:

It can greatly reduce the cost related to base work.
As it is not necessary to excavate the base, it only requires to flatten the ground, it can save the cost of construction.

 

Construction period is short
As excavation work is not necessary, the base work time can be saved.
If you would like to shorten building construction schedule, it is particularly suitable.

 

Earthquake resisting property is high:
As there is no gap between the base and the building, shakings such
as earthquake and so on directly spread to the building easily.

Therefore, earthquake resisting property is enhanced.

 

Environmental friendly:
As the excavation work is little, the influence to the base and surrounding environment is going to be small.

In addition, occurring of waste material is also diminished.

 

 

The work process of floor placement construction method

 

 

1.Investigating the ground

We investigate the ground at the building site.
We grasp the ground strength, depression and so on, and work out a suitable measurement.

 

2.Flattening the ground

If the ground is not flat, we do flattening work operation.
Through doing this, we secure the base stability.

 

3.Installing base

We install concrete block, steel and so on the ground, and form the base.
It plays a role of scattering the building weight.

 

4.Building construction

After completing the base, we construct the building.
We install the wall and pillar, then the building construction is finished.

 

 

Summary

As for floor placement work method, the cost efficiency is high, and the construction period is short.
Therefore, it is also known as a construction work method in the spotlight again recently.

 

It also excels in earthquake resisting property, so it is known as a work method which is well   environmentally considered too.

 

However, depending on the ground state, as there are sometimes unsuitable grounds too, the ground investigation in advance is indispensable.

 

If you are requesting to construct a building, how about considering floor placement work method?

 

We so far explained the merits of floor placement work and its construction method.

 

Finally,

On your interior decorative work such as office original state recovery and restoration work.
please give us your inquiry light heartedly!

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store)
original state recovery and restoration work, moving in work,
relocarion, withdrawal, reform work and so on, if you are considering to request,
please be sure to contact our company light heartedly!

 

 

Instagram     Twitter     Facebook   

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」
to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration
work at Ikebukuro, Toshima ward, please look for Office recovery and restoration Dot.Com.◆

Address: 〒171-0014
4th floor, Musashiya No.3 Building
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

Sticking on gypsum board by using GL (=gypsum lining) bond: Interior decorative work having both of durability and efficiency

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company office is at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing construction・Original state recovery and restoration construction for you.

 

In this website blog, we are explaining various themes of office, while we are sharing construction site examples.

In order for you as a reader to read these articles with pleasure, we would like to supply useful pieces of information to those who are considering to request interior decorative work in the future.

Please take counsel on any kinds of office interior work with us.

 

The content which we are introducing and explaining this time is a part of「GL construction method」.

 

On sticking on gypsum board by using GL bond

 

This time, what we are explaining is not construction site example or construction state, but an actual construction method.

 

 

Gypsum board is one of widely used materials for interior decorative constriction.

Among them, GL bond has excellent adhesive strength and durability, so, it is effective to stick on gypsum board.

Sticking on gypsum board by using GL bond is, not only able to realize efficient and even finishing result, but also able to enhance durability.

In this article, we are explaining the method of sticking on gypsum bord by using GL bond gypsum board and its merits in detail.

 

 

GLボンドを使った施工の写真がこちら

GLボンドを使った施工の写真がこちら

 

The above is a construction picture using GL bond.

 

 

What is GL bond?

We are explaining the feature of GL bond and its usage.

GL bond is an adhesive used for sticking materials such as wood, plywood, gypsum board and so on. It has powerful adhesive strength and durability, so, it is suitable for sticking on gypsum board.

 

The method of sticking on gypsum board by using GL bond

1 Preparing backing

Cleaning the wall surface, and neaten even state. If necessary, carrying on backing treatment.

 

2 Applying GL bond

Applying GL bond on the back side of gypsum board evenly.

Please be sure to use suitable GL bond amount, and applying it with uniformity as much as possible.

 

3 Sticking on gypsum board

Sticking applied GL bond surface and wall surface firmly, and sticking to gypsum board.

Then, pressing with suitable power, and securing even adhesiveness.

 

4 Drying and finishing treatment

After sticking on it, waiting until drying GL bond completely.

After that, doing joint treatment and finishing on the surface.

 

What is joint treatment?(Joint treatment work method)

Joint treatment is, a process of treating crack, dent and so on at the gypsum board junction part in gypsum board sticking.

Gypsum board is not used as a big board, but by sticking plural board together to match the necessary size, the wall surface and ceiling are formed.

In order to fill the joint part and gap, to realize uniform and beautiful finishing, joint treatment is duly done.

 

Joint treatment is, an important process for neatly finishing the joint part of gypsum board in GL work method.

We are explaining the procedure of general joint treatment as follows:

 

1.Sticking joint tape

Sticking joint tape at the joint part of gypsum board.

Joint tape, plays a role of preventing crack, and enforcing joint part.

Let us stick the tape evenly at all of the joint part.

When sticking the tape, it is important to do this work operation by pressing the joint part firmly at the same time.

2.Applying joint compound (bond)

After sticking joint tape, filling the tape by using joint compound(bond). Joint compound, plays a role of neatening the surface of gypsum board, and unify the joint part. Let us use wide  brush and sponge, and applying it to spread compound evenly.

 

3.Drying compound

Waiting for joint compound to be fully dried.

Let us confirm the drying time according to the product instruction.

If you want to shorten the drying time, it is possible to heat it or to use drying devise to shorten the time.

 

4.Sanding(polishing)

In order to smoothen the dried joint compound finishing, using sanding with sandpaper or sand sponge.

Getting rid of unnecessary 凹凸and surface roughness, neatening the joint part to even state.

After sanding, let us clean the wall surface with vacuum machine and cloth.

 

The above is a general procedure of joint treatment.

 

However, as to the concrete procedure and material usage, they may differ, depending on the site situation and construction condition sometimes.

We propose you to take counsel with a professional interior decorative contractor, and request to do a suitable joint treatment.

 

The picture to stick on gypsum board

 

 

The merits of sticking on gypsum board by using GL bond

・Firm adhesive strength

GL bond has excellent adhesive strength, and it firmly fixes gypsum board on the wall surface.

 

・Enhancing durability

Gluing with GL bond is excellent in durability, so, it protects long-term peeling and floating up of gypsum board.

 

・Efficient construction

By using GL bond, sticking on gypsum board work operation can be done quicky and smoothly.

 

What to be careful and professional advice

・A suitable backing treatment is important. Let us clean up the wall surface and make it even politely.

・A suitable applying amount of GL bond and evenly applying are necessary. Let us carry on work operation according to the instruction, and strive to stick it on the board evenly.

 

If necessary, we recommend you to get an expert advice and guidance.

 

 

Summary

Sticking on gypsum board by using GL bond is, an important method on  pursuing efficiency and durability in interior decorative work.

Because of the strong adhesiveness and durability, it prevents peeling and floating up of gypsum board, so, it keeps long-term beautiful finishing result.

While doing right method and suitable construction, let us stick on gypsum board by using GL bond. As the result, it may realize interior decorative finishing which excels in durability.

 

Your request・inquiry from here.

 

If you are interested or have request in interior decorative finishing work, please give us your inquiry light heartedly.

We will propose the most suitable planning and construction to match your requirement and budget.

 

An original state recovery and restoration construction site example using GL work method is here

 

原状回復工事(1)

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

If you are considering to request office building・tenant(shop or store) original state recovery and restoration work, moving in work, relocation, removal, reform work, and so on, please be sure to contact our company light heartedly!

 

 

Instagram     Twitter     Facebook   

 

You can also give us your inquiry from SNS social media. Please see them together by all means!

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves.
Our aim is, supplying
「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

◆If you look for interior decorative work・original state recovery and restoration work at Ikebukuro, please just look for Office recovery and restoration Dot.Com.◆