【Construction work site example】Construction work before moving in. Shinjuku clinic.

Hello everyone!We here are Office recovery and restoration Dot.Com. website.

Our company has an office at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto area, we are an interior decorative finishing construction work contractor professionally taking charge of all of《interior decorative finishing work》《recovery and restoration construction work》specialized in office construction work.

 

Today, an interior decorative construction work site which we are explaining is a before moving in construction work at internal medicine clinic.

 

Construction work of before moving in tenant.

We supported smooth moving in for a tenant customer with relieved construction work.

Everyone can work at his or her ease pleasantly. In order to make that charming space, we building construction work expert utilizes abundant experiences, and carry out highly specialized construction work operation.

Through diligent and frequent advanced meeting with a customer, we go on making drawing of the most suitable pattern, then are preparing more functional and efficient office environment.

 

The construction work contents are wall, floor, door, ceiling and so on, which are related to subordinating skeleton construction work.

Doing increasing work involving in big and small concept partition’s anti-disaster facility,  and air-conditioning facility’s changing・moving・increasing.

 

We requested electricity work to other specialized company.

 

The following picture is that of before moving in.

 

Various places such as electric wiring are in bare situation.

At this time, curing work operation has been already completed.

 

In the first place, we move in relative materials.

After that, we spread mat all over on the floor.

 

 

We go on assembling and mounting LGS (=light gauge steel) at the ceiling.

 

 

After finishing the work of ceiling, we set up the room wall with LGS conforming with floor mat.

 

 

We process gypsum board conforming with LGS, and do sticking work operation.

 

At the same time, we set up fixture frame at wall and ceiling bedding.

 

 

 

When partition wall work operation is close to be finished, we stick on gypsum board at the ceiling too.

 

 

After completing board work operation, we execute various things such as cloth construction work or so for finishing work operation.

 

 

 

 

After completing board work operation, we execute various things such as cloth construction work or so for finishing work operation.

Above all are the rough contents.

 

This time, our explanation is about clinic site.

As our company is dealing in office buildings, and various tenant items, we are waiting for your relative inquiry light heartedly.

 

 

On『office renewal』『tenant renovation decorative work』, as we are happy to answer for youe your moving in construction work, and various interior decorative construction work・recovery and restoration construction work.

Please be sure to give your relative inquiry to us light heartedly in the first place!

 

 

 

~~~~~~~~~~~~~~~~~〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜~~~~~〜〜〜〜〜〜〜〜〜〜

 

Instagram     Twitter     Facebook   

You can also give us your relative inquiry from above SNS.
Please be sure to see above SNS once at least by all means.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

 

★If you look for interior finishing work in Ikebukuro, ask for Office restoration Dot Com.

★If you also look for restoration work in Tokyo, please ask Office restoration Dot Com.★

Address:〒171-0014  
4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

【Construction work site example】Recovery and restoration construction work. Yokohama office building.

Hello everyone!We here are Office recovery and restoration Dot.Com. website.

Our company has an office at Ikebukuro, Toshima ward, Tokyo, and we are professionally taking charge of recovery and restoration construction work and interior finishing work.

 

Today, we are thinking of explaining recovery and restoration construction work at an office building site.

 

Construction work kind: recovery and restoration construction work.

Construction work location: one floor office building in Yokohama city.

Construction work period: 3 weeks

 

【Contents of recovery and restoration construction work】

In order not to hurt the building, we carry on curing work operation, and demolition work operation of interior decoration.

After moving out partition(LGS(=light gauge steel)・partition) work operation, we gather up waste materials coming from demolition and dispose them together.

After that, we do recovery work operation of demolished places.
Then, we finally clean up the site, and pass on the property to the owner.

 

 

 

 

 

We are explaining only a little about recovery and restoration construction work.

Recovery and restoration construction work generally means returning a property from 「present situation」 to「the time just started to rent」situation.
Depending on the contract details too, for almost all the cases, it is fixed in the contract that the renter should get rid of partition and all the equipment installed by tenant side convenience generally according to the contract, and return the property to the lender.

 

That is all for our explanation of construction work site sample this time.

 

On office building relocation or moving out, if you are worried or in trouble, please be sure to give us your inquiry light heartedly.

 

 

 

~~~~~~~~~~~~~~~~~〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜~~~~~〜〜〜〜〜〜〜〜〜〜

 

Instagram     Twitter     Facebook   

You can also give us your relative inquiry from above SNS.
Please be sure to see above SNS once at least by all means.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

 

★If you look for interior finishing work in Ikebukuro, ask for Office restoration Dot Com.

★If you also look for restoration work in Tokyo, please ask Office restoration Dot Com.★

Address:〒171-0014  
4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

Ginza office building. Reform construction work

Hello everyone!We here are Office recovery and restoration Dot.Com. website.

Our company has an office at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto area, we are an interior decorative finishing construction work contractor professionally taking charge of 《interior decorative finishing work》《recovery and restoration construction work》.

 

This time, we are explaining an interior decorative construction work site of an office building located at Ginza.

 

Construction work kind: reform construction work.

Construction work location: 6th floor, Ginza, Chuuou ward, Tokyo.

Construction work period: about 3 days

Construction work details:

 

In the first place, we cure corridor, elevator, resting room, and work operation area.

After that, we install ※LGS(=light gauge steel) gypsum board wall, do installing work of reception counter, fixture, and do cloth sticking work.

※Office’s LGS gypsum board wall is a kind of wall with light steel post mounted, and gypsum board sticked on it. Recently, the case of installing one at the office is increasing. As a merit of LGS gypsum board wall, comparing with steel partition and aluminum partition, sound insulating property effect is high, and it can present calm space.

That is all for our explanation of the construction work site sample.

 

 

Office building relocation, withdrawal, renewal or so on, if you are considering any of them, please be sure to contact our company light heartedly.

 

 

 

Instagram     Twitter     Facebook   

You can also make your relative inquiry to us from above SNS. Please be sure to see above SNS once at least by all means.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

 

〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜〜

★If you look for interior finishing work in Ikebukuro, ask for Office restoration Dot Com.

★If you also look for restoration work in Tokyo, please ask Office restoration Dot Com.★

Address:〒171-0014  4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Free phone: 0120-978-226

 

Newly decorative construction work  Apparel store (Construction work site example)

Hello everyone!We here are Office restoration Dot.Com. website.

 

This time, we are explaining a construction work site example of apparel store.

 

Details:

Construction work kind: New decorative construction work

Construction work floor numbers: 2 floors

Construction work period: about 2 months

 

Construction work details: This apparel store has its own particular interior decoration requirements. So, various ideas of special display LGS (=light gauge steel) processing or so were executed.

 

We are explaining display construction work of some parts from xtraction.

First of all, we process LGS and mount foundation part.

Then, we mount LGS processed for displaying use height on it.

Cut LGS is being placed on the floor.

As this curved LGS is bent for curving specifications, so processing points are strict, so it requires skilled technique.

After LGS mounting is all finished, we go on work operation of installing board.

In the first place, it is work operation of display back face.

Conforming with curved LGS processing, we use special board.

We execute sticking plaster board at normal place (=flat place), while sticking bendable FG board at bending processed place.

※As we also uploaded at our relative blog before, the processing method of FG board is, sprinkling water on board, then executing curved face processing, conforming with curved face bedding.

Water sprinkling method is, placing board horizontally first. If sprinkling water only from one side, about 7 to 8 minutes after sprinkling, while if sprinkling from both sides, after sprinkling either side, leaving about 3 minutes.

Then, about 3 minutes after sprinkling water at the back face, leaving about 3 minutes respectively. After fully absorbing water to board center, then go on executing construction work.

After completing back face work operation, we go on operating display front face.

After complete mounting LGS front side, we go on installing box before sticking board, conforming with the specification of decorative selling goods design.

After installing box, we go on cutting and sticking FG board and plaster board, conforming with box.

This way, we go on making decorative shelf part for selling goods.

The following is a picture from above after finishing all the work process.

Concerning the display which we explained this time, the curve has a characteristic impression.

It was a kind of display unable to process without using LGS and special board.

 

If you have a request, it is possible to make various displays.

So, if you should also have particular needs of display, together with interior decorative construction work, please be sure to give us your request by all means.

 

 

 

『On office renewal・shop or store remodeling』, interior decorative construction work・recover and restoration construction work and so on, if you are worried, please be sure to give us your inquiry light heartedly at first.

 

Instagram     Twitter     Facebook   

 

Please also give us your follow of Instagram, Twitter, Facebook light heartedly.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~~

★If you look for interior finishing company in Ikebukuro, ask Office restoration Dot.Com★

★If you also look for office restoration work in Tokyo, ask Office restoration Dot.Com.★

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Free phone: 0120-978-226

~~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~~

System ceiling construction work A construction work example Office building

Hello everyone!We here are Office restoration Dot.Com. website.

 

Today, we would like to explain a construction work example of system ceiling framework construction work at an office building.

In the first place, system ceiling is a kind of hanged ceiling basically, with equipment such as air-conditioner and lighting or so, mounted together with ceiling board material at attic, that is a ceiling which is set so as to be put in at bedding・frame.

A merit of system ceiling is very high maintenance quality. Let alone ceiling material itself, ceiling equipment such as lighting or so can be easily moved・changed too. Therefore, it is rather easy to correspond to layout change. When a part of ceiling material or equipment happen to be deteriorated・damaged, it can be soon renewed too. As ceiling material is mounted in a linear manner, it is also smart visually.

 

Then, we would like to explain the flowing of relative construction work.

It is construction work of ceiling recovery and restoration work after moving out sliding wall.

Sliding wall is an easily movable partition which can be partitioned in a room. Its system is moveable by using hanged rail installed at ceiling.

 

Then, the following are site pictures at system ceiling framework construction work after moving out sliding wall

Above all are site pictures of system ceiling framework construction work.

After this, the construction work will be completed by mounting board. However, the operation work of our company will be over by mounting framework.

 

As it is possible for our company to do any relative construction work, so please be sure to give us your inquiry light heartedly.

 

On 『office renewal・shop or store modifying』, interior decorative finishing work・restoration work and so on, if you are in trouble or worried, please feel free to give us your inquiry in the first place.

Please follow up our Instagram, Twitter, and Facebook light heartedly.

 

 

Instagram     Twitter     Facebook   

 

From price quotation up to construction work finishing, our company is directly managing and working by ourselves, so we are aiming to supply「most reasonable, high quality and good products」 to you.

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~~

★If you look for interior finishing company in Ikebukuro, ask Office restoration Dot.Com★

★If you also look for office restoration work in Tokyo, ask Office restoration Dot.Com.★

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Free phone: 0120-978-226

~~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~~

What is safety patrol? What is being done, and watched

Hello everyone!We here are Office restoration Dot.Com. website.

Mainly at Ikebukuro, in all over Kanto area, we are executing construction work professionally of 「Interior decorative finishing work」「Recovery and restoration work」.

 

This time, changing our usual preference, we are explaining the theme of,

 

What is safety patrol? What is being done, and watched

Due to a matter of convenience of the theme, please also take attention as we may also touch some points on whole construction work including other than interior decorative work roughly.

After brief explanation on safety patrol, we are also going on explaining where to be watched and executed.

 

Contents

1 What is safety patrol?

2 What kind of points are to be checked?

2.1 Checking out tools and the like, the situation of checking

2.2 If work operation procedure is suitably set, and if it is being executed accordingly

2.3 If work operation area and work operation range safety are kept, and its method of keeping safety is suitable?

2.4 Ancillary to above, whether putting work site in order and cleaning work site or so are executed or not?

3 Summary

 

What is safety patrol?

Safety patrol is, in order to maintain work site safety, each work site contractor personnel in charge actually is patrolling(rounding) , and checking if problem is occurring safety wise.

As for workers at work site, there also may be abbreviation called it as「An pato(in Japanese)」or so.

(There is a case of safety personnel in charge at a general construction contractor doing by own self too)

 

When a relative work site starts its actual work, the general contractor reveal and examine every can-happen dangers. From that, we will request each work site contractor to do site work operation.

 

However, at work sites where can often occur different methods or unthinkable aspects, in encountering every certain pose(or before encountering it), we may request patrolling again by considering each contractor’s point of view, and checking if its maintaining safety standards is becoming the safest and prompt method.

 

Therefore, by labeling as safety patrol, a general contractor requests each site contractor to go to see「In present work site situation, if safety standard decided as 〇〇 should be satisfying, or if there should be improving points」and also by maintaining work site safety, thus we are keeping construction work quality.

 

What kind of points are to be checked?                                                                                                       

 

As to what kind of points are being checked, if we directly state the conclusion,

It differs according to each work progress situation, or each work contractor.

However, as it is「safety patrol」, we should go on checking all of the points relating safety.

 

Basically,

 

・Situation of examining tools or so, and checking

If work operation procedure is being suitably arranged, or is duly executed

・If work operation place or work operation range is kept safely, or if the method of maintaining safety is suitable?

・Ancillary to above, if putting site in order, cleaning site is executed?

 

Checking above these items or so from general work contractor to each work contractor’s supervisor.

Usually, as to safety patrol, general work contractor let each work contractor make points to check, and each work contractor’s supervisor does its evaluation. If there is an awful place, it should be corrected.

As to a lot of general work contractors, 「checking lists」are made, and evaluation will be done according to them.

As a supplement, if doing visual search of「safety patrol check list 」or so by internet, then relative checking lists of various work contractors are hit.

Actually used lists besides template should not be printed or used freely. However, as to what kind of items other companies are checking, probably it seem to be worth for reference.

 

By applying above itemized sentences to interior decorative work as much as possible, we will go on enumerating them.

 

Checking out tools and the like, and checking situation

As for interior decorative construction work too, we use a lot of tools.

This time, we are explaining them roughly as follows.

 

On foothold

(Step ladder, scaffold ladder, step stool or so)

立ち馬。点検をきちんと行います。

立ち馬。天板に乗っての作業を前提とした足場で、天板部分や脚部を伸長し、高さや長さを変えることができる。(長さなどは変えられないタイプもあります)

Scaffold ladder. It is a kind of foothold presupposing work operation on top board. Extending top board area or its leg, we can change its height and length. (There is a kind unable to change its length or so too.)

 

Tools are usually set each usable life ages. They cannot be used over than the periods.

We check if a foothold used does not expire each life age, if the product is properly operating, is locked, and is not worn away, according to the manufacturer recommending checking method.

In addition, we also check if it is not rusted or mud is going into it or so, then its motion is worsened. Depending on the situation, we shall clean and maintain them.

 

On tools

(Cutter, impact driver, other construction work using electric and hand tools)

 

Same as foothold, almost all tools are also set their usable life ages.

We check if they are not used over the periods, and regular maintenances shall be done.

 

If work operation procedure is suitably set, or is accordingly executed

 

Even if the same construction work process is entrusted, possible dangerous situation at work site is changing, depending on construction work sites and work progress status.

Therefore, in the first place, when general construction work contractor enters work site, it will let each work site contractor decides 「in order to execute construction work safely and smoothly, what kind of process it should do and how to carry out 」.

 

On that, general construction work contractor will precisely let each site work contractor to patrol again if the work process is set and kept to do actual work by workers.

 

For example, please suppose「When executing this construction work at this place of ceiling, using 〇〇cm or more length scaffold ladder, not using stepladder, a single worker should not do work operation alone」, which should exist as work operation process.

As for safety patrol, we will go on checking if these are really right process, and if the process is being observed.

Even if other work site should be considered right, it may not be always safest at the work site this time still under present situation.

 

If you happen to feel something as a problem, you have to examine different method. Even if it is right, but cannot be observed, then it is meaningless. So, we shall study what to do to be able to observe.

 

If work operation area and work operation range safety are kept, and its method of keeping safety is suitable?

頭上注意の印。狭い部分なのでテープにて簡単ではあるが注意を促している

弊社施工の現場にて、足場頭上部分に「頭上注意」のテープを貼り、注意を促している。

Above picture at our company work operation site, sticking the tape of 「Watch your head」at foothold overhead area, demanding caution

 

As many of work operation area is freshly made building, so at footing and overhead areas, opening part, or overwrapping work operation range with other types of industry or so, there are a lot of hidden dangers.

 

Therefore, at safety patrol, we will check「if the work site is kept safely and correctly as much as possible」or「how it is maintained」。

 

For example, please suppose an arrangement of 「At a work operation on 〇〇, there is a ceiling construction work with equipment contractor at the same room. Meeting in advance, then in case it is still necessary to do work in the close area at the same time, then equipment contractor does from east area, and interior decorative contractor does from west area. Both should say something in advance.」 is done.(It is still just for an example, so it is not necessarily right method of keeping work site safety.)

We are going to consider if those arrangement is precisely observed, and if there should be safer method・countermeasure.

 

Ancillary to above, whether putting work site in order and cleaning work site or so are executed or not?

 

There is a word of 5S at work site and factory, which is supposed to be must.

Respectively, these meanings are putting in order・tidying up・cleaning・neat・discipline in Japanese sound starting from S.

We check if they are executed from safety point of view.

This time, we only limit to explain roughly as below,.

If passage from material moving in entrance~to work site is neatly divided(putting in order)

If there are not easily stumbling waste materials or tools or so placed at footing area(cleaning)

Or if those are made public(discipline)

5Sの一つ、清掃は美観の他、つまづき、踏み抜きなどを防ぎ安全のためにもなります

5Sの一つ、清掃(掃除)は、見た目の美化だけでなく廃材などで足を怪我しないためにも行われます

Above picture is one of 5S, cleaning is done not only for visual beauty, but also for preventing foot or leg injury for waste materials

 

Of course, delay of fixed construction work period should not happen.

If labor accident should occur, operation workers cease to work, and work site stops. Furthermore, that may lead to image down of general work contractor’s point of view. So, making light of safety means no good at all.

 

It seems that correct execution of 5S can be said reasonable.

 

Summary

We have so far briefly explained what is safety patrol, and what is watched at safety patrol.

Concisely making summary as below,

 

・Safety patrol means a kind of checking activity of general construction work contractor own or general work contractor request each work site contractor, under present work site situation, if the construction work is executed by best possible safety method and condition.

・Literally, by checking safety related items from plural viewpoints, based on advanced made check list, evaluate them.

・By maintaining work site safety, it is playing a role of preventing delay of work period arising from labor accident or image down.

 

From viewpoint of laborers working at work site, it often seems that safety patrol can be a kind of「haltering work operation efficiency, dismal habit」.

However, a general construction work contractor has to do their best to let each work contractor under to work without occurring any injury, and complete site work to the end.

We are thinking of wishing all of you to understand that safety is irrespective of general work contractor・subcontractor, which is a necessary item required for all people.

 

In addition, by observing safety at work site, there are a lot of things that we also feel relative construction work will proceed smoothly too.

 

Our company also consider to observe daily safety, and to focus our energies and minds so as not to occur labor accident from now on too.

=-=-==-=-=-=-=-==-=-=-=-=-==-=-=-=-=-==-=-=-=-=-==-=-=-

 

Let alone office・shop or store ceiling or wall recovery work, and painting work, concerning newly opening, renewal and so on, please be sure to consult with our Office restoration Dot.Com. website light heartedly.

 

We ae waiting for your follow up of our 「Instagram, Twitter, and Facebook」.

Instagram     Twitter     Facebook   

 

 

 

From price quotation up to construction work finishing, our company is directly managing and working by ourselves, so we are aiming to supply「most reasonable, high quality and good products」 to you.

Of course, we do not mind if you compare our quotation with others, as we welcome it.

「How should we execute this construction work? Or how much does it cost approximately? 」or so on.

We are waiting for your question・inquiry.

On office・shop or store・warehouse relocation, recovery or restoration work, reform work(interior decorative construction work) , and so on, please be sure to give us your inquiry light heartedly in the first place.

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~~

★If you look for interior finishing company in Ikebukuro, ask Office restoration Dot.Com★

★If you also look for office restoration work in Tokyo, ask Office restoration Dot.Com.★

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Free phone: 0120-978-226

~~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~~

System ceiling construction work A construction work example Office building

Hello everyone!We here are Office restoration Dot.Com. website.

 

Today, we would like to explain a construction work example of system ceiling framework construction work at an office building.

In the first place, system ceiling is a kind of hanged ceiling mainly, equipment such as air-conditioner and lighting or so, mounted together with ceiling board material at attic, a ceiling set so as to be put in at bedding・frame.

A merit of system ceiling is very high maintenance quality. Let alone ceiling material itself, ceiling equipment such as lighting or so can be easily moved・changed too. Therefore, it is rather easy to correspond to layout change. When a part of ceiling material or equipment happen to be deteriorated・damaged, it can be soon renewed too. As ceiling material is mounted in a linear manner, it is also smart visually.

 

Then, we would like to explain the flowing of relative construction work.

It is construction work of ceiling recovery and restoration work after moving out sliding wall.

Sliding wall is an easily movable partition which can be partitioned in a room. Its system is moveable by using hanged rail installed at ceiling.

 

Then, the following are site pictures at system ceiling framework construction work after moving out sliding wall

 

Above all are site pictures of system ceiling framework construction work.

After this, the construction work will be completed by mounting board. However, the operation work of our company will be over by mounting framework.

 

As it is possible for our company to do any relative construction work, so please be sure to give us your inquiry light heartedly.

 

On 『office renewal・shop or store modifying』, interior decorative finishing work・restoration work and so on, if you are in trouble or worried, please feel free to give us your inquiry in the first place.

Please follow up our Instagram, Twitter, and Facebook light heartedly.

 

Instagram     Twitter     Facebook   

 

From price quotation up to construction work finishing, our company is directly managing and working by ourselves, so we are aiming to supply「most reasonable, high quality and good products」 to you.

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~~

★If you look for interior finishing company in Ikebukuro, ask Office restoration Dot.Com★

★If you also look for office restoration work in Tokyo, ask Office restoration Dot.Com.★

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Free phone: 0120-978-226

~~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~~

A piece of construction work example 《office building》partition wall

Hello everyone!We here are Office restoration Dot.Com. website.

Our company office is located at Ikebukuro, Toshima ward, Tokyo, and we are executing construction work professionally, for office buildings on《Interior decorative finishing work》《Recovery and restoration work》and so on of various construction work at buildings inside all over Kanto area for you.

 

Today, the construction work site which we are explaining is an office room located at Tanashi.

Its actual construction work detail is making partition wall(board finishing work).

The construction work period is a day.

 

Partition is, separating building inner space. The wall separating is called partition wall. It can be simply called 「inner wall」 too.

In order to use inner space effectively, by 「separating」a room classified by use such as living room, toilet, warehouse, and so on, then the room can be used effectively. This space separation is called partition.

And, the wall separating is called partition wall. As the purpose of partition wall is separating inner space, as different from outside wall, its earthquake resistance property is not required. LGS(=light gauge steel) and board are used for making partition wall. As partition wall cannot be directly installed inside the building, LGS is used as bedding. Gypsum board has sound insulating and heat resisting properties. However, compared with outside wall materials, its yield strength is relatively low.

 

The following is a construction work example picture this time.

In the first place, we go on mounting bedding by using LGS.

We go on carrying out sticking board operation work.

We completed sticking work, then the room was duly separated.

That is all for our explanation.

We recommend you to go on utilizing space by making partition wall!

Please be sure to consult with us light heartedly if you should separate your interior space.

 

On 『office renewal・shop or store modifying』, interior decorative finishing work・restoration work and so on, if you are in trouble or worried, please feel free to give us your inquiry in the first place.

Please follow up our Instagram, Twitter, and Facebook light heartedly.

 

Instagram     Twitter     Facebook   

 

 

From price quotation up to construction work finishing, our company is directly managing and working by ourselves, so we are aiming to supply「most reasonable, high quality and good products」 to you.

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~~

★If you look for interior finishing company in Ikebukuro, ask Office restoration Dot.Com★

★If you also look for office restoration work in Tokyo, ask Office restoration Dot.Com.★

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Free phone: 0120-978-226

~~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~~

一个施工工事事例《办公室建筑物》间壁 

大家好!我们这里是办公室修复原状Dot Com网站。

在东京都池袋设置着办公据点,在关东全域范围内,我们正在从事《室内装饰最后润湿施工工事》《修复原状施工工事》等建筑物内各种各样的施工工事。

 

今天,我们将要说明的施工工事现场是,在田无(=地名)的办公楼里面办公室的一屋。

施工工事内容是制作间壁(板材最后加工工事)。

施工工事期间为一天。

 

间壁是,分隔建筑物的内部空间的事情。分割用的墙壁叫做间壁。也可以单纯说「内壁」。

为了有效地使用内部空间,把起居室、洗手间、仓库等,按个别的用途「分隔」屋子就可以有效使用它。分隔此空间的事叫做间壁的分隔间隔。

而且,分隔间壁的墙壁叫做间壁。因为间壁的目的是分隔内部空间,所以跟外壁不同,并不必要耐震性能。为了制作间壁,轻量型钢和板材被使用。因为间壁不可以在建筑物内部直接设置,所以作为地基材料就使用轻量型钢。石膏板材有隔音性能和绝热性能。不过,和外壁材料比较起来,它的耐力比较低。

 

下面是此次施工工事事例的照片。

首先,我们使用轻量型钢来逐步组装地基。

我们逐步进行张贴板材的作业。

张贴作业完毕,屋子被分隔了。

我们此次的说明到此为止。

我们推荐各位依赖制作间壁来进行有效运用空间吧!

如果贵方想分隔室内装饰空间的话,欢迎务必乐意跟我们查询商量!

 

 

关于『办公室的更新店铺改装』室内装饰施工工事修复原状施工工事等,如果贵方感觉为难或有疑问,首先,请给我们随意来查询!

 

欢迎贵方随意关注我们的Instagram推特Facebook

Instagram        推特        Facebook    

 

从报价到施工完毕,我们公司全部都是亲自安排工事,我们的目标是给客户供应尽可能便宜的、质量高的好产品

~~~~~~~~~~~~~~~~~~~~池袋~~~~~~~~~~~~~~~~~~~~

★如果贵方想找池袋的室内装饰单位,务必来找办公室修复Dot .Com.网站★

★如果贵方想找东京的办公室修复原状工事单位,务必来找办公室修复Dot.Com.网站★

地址: 〒171-0014 东京都丰岛区池袋2-62-10 武藏屋第三楼四层

免费电话: 0120-978-226

~~~~~~~~~~~~~~~~~~室内装饰施工~~~~~~~~~~~~~~~~~~

系统天棚施工工事 施工事例 办公楼 

大家好!我们这里是办公室修复原状Dot Com网站。

 

今天,我们将要说明一下一个办公楼里面系统天棚钢骨框架施工工事的施工例子。

首先,系统天棚,基本上是一种吊挂天棚,把在屋顶层被设置的空调和照明等设备跟天棚材料一体组装将作为地基・框架被填入设置的天棚。

 

系统天棚的优点是,保养性能非常高。对天棚材料本身当然是,照明等天棚设备也可以简单地移动・交换。因此,它也容易对待设计变更。其中一部分的天棚材料和设备劣化或破损时,也可以立刻重新对待。因为天棚材料是直线会被配置,所以看上去也是精明的。

 

那么,我们想要说明一下本施工工事的流动过程。

我们首先的施工工事是把撤去滑动墙壁后的天棚修复施工工事。

滑动墙壁是,一种在室内可以随时分隔的可动式间壁,吊挂在天棚设置的轨道而能移动的构造。

 

那么,下面的照片是把滑动墙壁撤去后系统天棚框架施工工事后的现场照片。

上面是系统天棚框架施工工事的照片。

然后,装载板材就完成的。不过,我们公司的作业,组装框架就结束了。

 

因为我们都可以对待任何有关作业,所以务必随便来查询!

 

关于『办公室的更新店铺改装』室内装饰施工工事修复原状施工工事等,如果贵方感觉为难或有疑问,首先,请给我们随意来查询!

 

欢迎贵方随意关注我们的Instagram推特Facebook

 

Instagram        推特        Facebook    

从报价到施工完毕,我们公司全部都是亲自安排工事,我们的目标是给客户供应尽可能便宜的、质量高的好产品

~~~~~~~~~~~~~~~~~~~~池袋~~~~~~~~~~~~~~~~~~~~

★如果贵方想找池袋的室内装饰单位,务必来找办公室修复Dot .Com.网站★

★如果贵方想找东京的办公室修复原状工事单位,务必来找办公室修复Dot.Com.网站★

地址: 〒171-0014 东京都丰岛区池袋2-62-10 武藏屋第三楼四层

免费电话: 0120-978-226

~~~~~~~~~~~~~~~~~~室内装饰施工~~~~~~~~~~~~~~~~~~