Underlay (base treatment) construction method │On office OA(=office automation) floor/ flooring 

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

Our company has an office at Ikebukuro, Toshima ward, Tokyo, and we are an interior decorative construction contractor, mainly taking charge of Interior decorative finishing construction・Original state recovery and restoration construction in all over Kanto district for you.

 

On this website blog, we are explaining various themes at the office and sharing construction site examples. In order to let this blog readers to enjoy reading them, we are thinking of supplying easy to understand and useful information to those who would like to request interior decorative construction in the future.

Kindly take counsel with us on any office interior decorative construction.

 

The content which we are explaining here is, on office OA floor/flooring construction partly.

 

This time,

 

It is on
「underlay (base treatment) construction method」

Quoted from FUKUBI Chemical Industry Co.,Ltd., website underlay ※pictorial image link

 

 

For OA floor/flooring, base treatment is one of the important operation work processes.

 

  1. Before laying OA floor/flooring, laying underlay is popular.

Underlay is, a material spreading under the floor.
Its roles are preventing hurt and sound on the floor, and enhancing the floor durability.

 

  1. By constructing underlay under vinyl chloride tile, carpet, long sheet,
    it becomes a floor base material sheet to absorb overturned impact to reduce hurting risk.

Because it is active as a floor/flooring material for various facilities,
it can be also used not only for office OA floor, but also for elderly dwelling and facility, educational facility, and so on.

 

 

We are explaining underlay construction method as follows:

 

  1. Base treatment on the floor surface

Before spreading underlay, it is necessary to treat floor surface base.

Confirming that the floor surfacer is flat, and without dirt or hindrance.

Please also confirm that it is dry well, and get rid of dust and obstacle.

If required, spread materials such as gravel, sand and so on, then set it flat.

 

  1. Spreading underlay

Spreading underlay on the floor surface.

The methods of spreading the underlay are, full spreading, half spreading ad so on.

Full spreading is, the method of spreading underlay on all over.

Half spreading is, the method of spreading underlay all over at a few centi-meter inside from the edge.

Full spreading method can be maintained evenly all over the floor, but by using a lot of material. While, as for half spreading, material used quantity can be smaller. However, as a demerit, underlay is easy to be shifted.

 

  1. Sticking underlay

After finish spreading underlay, if required, fixing it by using adhesive.

When using adhesive, according to the construction method, coating it evenly on the floor, and thrusting the underlay from above. After the construction, please let off air with stripping-off rod. After the adhesive is dried, it is possible to lay OA floor/flooring.

 

 

※Point to be noted when executing finishing material

After executing FUKUBI underlay construction, please cure it for equal to or over than 24 hours firstly, then execute finishing material construction.

Please avoid laying floor finishing material and FUKUBI underlay joint together.

When cutting cushion floor and vinyl floor sheet together, please do not cut them overlapped with FUKUBI underlay.

Besides, please execute construction by following the construction method of each finishing material.

 

Summary

The construction methods of underlay are sometimes different according to floor types and construction contractors.

The important point is, the construction contractor has the suitable skill, and execute the precise construction.

In addition, before executing construction, it is necessary to fully check the important points such as laying the plan, treating the base, and so on.

That is all for our explanation of the construction method of underlay.

 

Finally,

On office interior decorative construction, please take counsel with us light heartedly.

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

On office building・tenant(shop or store) original state recovery and restoration cnstruction・renovation decorative construction・recovery and restoration construction, moving in construction, relocation, removing, reform construction and so on, if you are considering to request, please be sure to contact us light heartedly.

 

Instagram     Twitter     Facebook   

 

It is also possible to give us your inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation to construction work completion, our company directly manage and do all of construction work by ourselves.

So, we are supplying
「reasonable construction work as much as possible with high quality and better service」
to our customers.

 

◆If you look for interior decorative construction・original state recovery and
restoration construction at Ikebukuro, Toshima ward, please contact
Office recovery and restoration Dot.Com.◆

Address: 〒171-0014

4th floor, Musashiya No.3 Building

62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo