Construction site example | New tenant work (Interior decorative work) at a multi-purpose building in Ageo city, Saitama prefecture

Hello, everyone! We here are Office recovery and restoration Dot.Com. website.

We have been setting up our company office at Ikebukuro, Toshima ward, Tokyo, and we are an interior decorative construction work contractor, mainly taking charge of Interior decorative finishing work・Original state recovery and restoration work in all over Kanto district for you.

 

This time, we are introducing and explaining a construction situation in Saitama prefecture. It is a new interior decorative work of a certain tenant.

 

The interior decorative groundwork construction in the tent property is a very important process for finishing the space of shop, store, office and so on wonderfully.
We can realize a beautiful finishing result and long-term durability by doing the groundwork construction well.

Firstly, we are explaining the purpose of groundwork construction.
Groundwork construction is a work operation of neatening the surface of wall, floor, ceiling and so on evenly.
The main purposes of groundwork construction are as follows:

 

  • ●Adjusting, repair, mending of groundwork:
    By neatening the groundwork surface evenly, when doing finishing work of wall paper・so-called decorative cloth and so on, unevenness and 凹凸
    will be difficult to happen.
    By doing these, a beautiful finishing result can be realized.
  • ●Going up durability
    We strengthen itppropriately in the groundwork construction.
    By doing this, the strength of the interior decorative material and the durability will go up, so deterioration and damage by using long time will be reduced.
  • ●Stability:
    Groundwork work construction is an important process of securing wall and ceiling stability.
    By doing an appropriate groundwork construction, gypsum board and so on are fixed well, so the stability will be secured.

 

 

 

  • ●Installing steel frame:
     The first step of groundwork construction is installing runner.
    By cutting the runner to match the wall and ceiling suitable place, then we fix it at the accurate place.
    By using a laser measuring instrument or the like, while confirming horizontal and vertical level, we install the runner firmly.

 

 

We install stud. What is erected vertically against runner is stud.

 

  • ●Installing strengthening material:
    If it is required, we install a strengthening material.
    We sometimes install it at the open door part and so on, so it will enhance the structural strength and stability.
    By placing the strengthening material at the appropriate position, we will fix it with screw and so on.

 

  • ●Installing the board:
    The final process of light steel groundwork is installing the board.
    As a general board, there is gypsum board.
    By cutting the board to the suitable size, we install it to the light steel groundwork with screw.

 

  • ●Adjusting, repair, mending of groundwork::
    After the board work, we confirm the groundwork flatness.
    If it is necessary, we will adjust, repair, and/or mend it.
    In order to fill 凹凸 and cracks, we use a suitable repair and mending material.
    By using a repair and mending material, we secure the flatness of work surface, and enhance the finished quality.

 

 

  • ●Transferring to finishing process:
    After completing light steel groundwork construction, we proceed to the next process.
    In the finishing process, we do interior decorative finishing, such as painting, sticking wall paper, flooring, and so on.
    As light steel groundwork excels in stability and durability, the construction of finishing material will proceed smoothly, so it is possible to realize a beautiful interior decorative space.

 

 

 

 

The above is the basic flow of light steel groundwork construction procedure.
Light steel groundwork is a suitable material for tenant interior decoration which requires durability and stability.
For its construction, as the specialized knowledge and experience are necessary, we recommend you to request a well experienced construction contractor.

 

Please understand that we will execute construction in Japan only.

 

 


 

If you are considering to request us office building・tenant(shop or store)
original state recovery and restoration work, moving in work, relocation,
removal, renovation work, and so on,
please contact our company light heartedly by all means!

 

Instagram      X     Facebook  

You can also give us your relative inquiry from SNS social media.
Please be sure to see it together.

 

From price quotation up to construction work completion,
our company is directly managing and doing construction work by ourselves.

Our aim is, to supply
「reasonable construction work as much as possible,
with high quality, better work service」to our customers.

 


 

If you look for interior decorative work・
Returning to original state and restoration work in Ikebukuro,
Toshima ward, please visit Office restoration Dot.Com.

 